◉ WhatsApp Skip to content
Construction & Project Managementoffice@kasanjeconstructioncompany.com · +256 746760909
October 12, 2026

How to Check defects liability Before Approving the Next Building Stage

Before approving the next building stage, check defects liability alongside the quality of the completed work. Review what your agreement says about defects, who is responsible for addressing them and how repairs will be checked. Do not rely on a verbal promise that problems will be fixed later.

For property owners building in Uganda, the review should use the actual drawings, specifications and site conditions. Whether the project is in Mbale or elsewhere, keep a written record of what has been inspected, what remains unresolved and who may approve the next stage.

Quick planning summary

Decision What to establish Evidence to request
Project purpose What successful completion means for this property Written brief and relevant drawings
Site conditions Access, drainage, soil, boundaries and neighbouring structures Site visit and survey information
Cost planning Measured quantities, quality level, transport and contingency Itemised quotation and assumptions
Workmanship Qualified personnel, inspection points and test requirements Supervisor details and checklists
Handover Defects, records, maintenance and warranties where offered Signed inspection and handover notes

Check the agreement and responsibilities

Read the agreed scope and any terms covering defective work before signing off a stage. Identify the person responsible for receiving defect reports, arranging repairs and reviewing the result. If the wording is unclear, seek clarification before approval rather than assuming everyone understands it the same way.

Check whether the agreement specifies a process or timeframe for reporting and correcting defects. Keep these requirements with the project records. Do not assume that a warranty is offered or that the same terms apply to every part of the work.

Confirm what the completed stage should include

Use the latest approved drawings and written specifications as the basis for inspection. These should describe the relevant dimensions, materials, finishes and workmanship requirements. A general description such as “standard work” is not a clear basis for checking quality.

Record any approved changes, including their date and the person who authorised them. Where the cost of an item remains uncertain, identify it as a provisional allowance rather than treating an estimate as a fixed price.

Check Practical action Common oversight
Project scope Confirm project scope against the project brief Relying on verbal assumptions
Access and transport Ask how access and transport affects cost and timing Ignoring site-specific constraints
Responsibility Assign a named person to review the result No one signs off the work
Records Save dated evidence and receipts Missing documentation at handover

Inspect work before it is covered

Arrange inspection while the work is still accessible. Compare the completed activity with the approved scope, and photograph work that will be hidden by the next stage. Keep delivery notes and any required inspection or test records with the photographs.

Check whether drainage, access, neighbouring structures or other site conditions differ from the original plan. If they do, ask the supervisor to review the effect before proceeding.

For concerns involving structural safety, electrical installations, sanitation, fire safety or statutory approval, obtain advice from a suitably qualified Ugandan professional. Photographs and a visual check should not replace the required professional review.

Record defects and agree on follow-up

Keep a dated defect list instead of relying on site conversations. For each issue, record:

  • Where the defect is and what was observed.
  • The drawing or specification used to assess it.
  • Photographs or other supporting records.
  • Who will arrange the corrective work.
  • The agreed action and timing.
  • Who will inspect the repair and record the outcome.

Separate completed repairs from unresolved items. Ask the person responsible for inspection to confirm whether any outstanding issue affects the next stage or would become harder to inspect once covered.

Review access and future maintenance

Consider how repairs and later maintenance will be carried out. Confirm that the proposed sequence allows access for inspection and corrective work. Discuss any effect on cost or timing before approving changes.

Check Practical action Common oversight
Access and transport Confirm access and transport against the project brief Relying on verbal assumptions
Future maintenance Ask how future maintenance affects cost and timing Ignoring site-specific constraints
Responsibility Assign a named person to review the result No one signs off the work
Records Save dated evidence and receipts Missing documentation at handover

Control changes to materials and specifications

If a proposed repair changes a material, finish or construction detail, record the proposal and obtain the relevant approval. Make sure the site team has the latest approved instructions. Review the intended use, weather exposure and maintenance needs rather than accepting a substitute without checking it.

Check Practical action Common oversight
Future maintenance Confirm future maintenance against the project brief Relying on verbal assumptions
Materials specification Ask how materials specification affects cost and timing Ignoring site-specific constraints
Responsibility Assign a named person to review the result No one signs off the work
Records Save dated evidence and receipts Missing documentation at handover

Keep a clear stage approval record

Before approval, bring together the inspection notes, defect list, repair records and approved changes. Record exactly what has been accepted and identify any unresolved items. Keep the dated sign-off with the project documents so the next stage starts from a clear, shared understanding.